Google Douglas County data center operations form the foundation of Google’s long-running data center presence in Georgia. Google says it began establishing its Douglas County presence in 2003, opened the data center in 2007, introduced recycled industrial water for cooling in 2012 and announced a $300 million expansion in 2015.
Unlike Georgia’s newest proposed hyperscale campuses, the Douglas County facility is an established operating data center with years of publicly reported efficiency data. It is also an important case study for how a large data center can use reclaimed industrial water instead of relying entirely on drinking-water supplies for cooling.
Last updated: September 22, 2026
Current status: Operating
Compare this campus with newer developments on the Georgia Data Center Projects Tracker and the U.S. Data Center Projects Tracker.
Google Douglas County Data Center at a Glance
| Detail | Current information |
|---|---|
| Company | |
| Location | Douglas County, Georgia |
| Status | Operating |
| Georgia presence began | 2003 |
| Data center opened | 2007 |
| Recycled-water cooling began | 2012 |
| Major announced expansion | $300 million in 2015 |
| Current Google Georgia investment | More than $3 billion statewide to date |
| Last updated | September 22, 2026 |
Where Is the Google Douglas County Data Center?
The Douglas County campus is located in Douglas County west of Atlanta. Google lists Douglas County as an operating North American data center location and identifies it separately from the company’s newer Georgia developments in LaGrange and Columbia County.
Google’s official Georgia data center page says the company has committed more than $3 billion of investment in Georgia since establishing the Douglas County operation. That statewide figure includes the company’s broader Georgia presence and should not be treated as the cost of the Douglas County campus alone.
Google Douglas County Data Center History
The Google facility is one of the older hyperscale campuses in Georgia. Google says its timeline in the county began in 2003, followed by the opening of the data center in 2007.
In 2015, Google announced a $300 million expansion. That history makes Douglas County useful for understanding how hyperscale campuses evolve: a project may open with an initial phase and then continue receiving new buildings, equipment and infrastructure investments over many years.
That differs from a newly proposed campus where the entire build-out exists only on a master plan. Our guide to data center construction timelines explains why large campuses can remain in continuous development long after the first building becomes operational.
How the Google Douglas County Data Center Uses Recycled Water
One of the most notable features of the operating Georgia campus is its use of recycled industrial water for cooling. Google says it began using recycled industrial water at its Georgia data centers in 2012.
The approach reduces the need to use potable drinking water for every unit of cooling demand. Instead, water that is not intended for drinking can be treated and reused as part of the data center’s cooling process.
This does not mean the facility has zero water impact. Cooling systems still need to be evaluated based on source, consumption, discharge, seasonal demand and local water conditions. But the Douglas County system demonstrates why the question should not simply be “How much water does a data center use?” Communities should also ask what kind of water is being used.
Read our guide to data center water use for a detailed comparison of evaporative, closed-loop, dry and reclaimed-water cooling strategies.
Energy Efficiency at the Douglas County Campus
The Douglas County campus is also one of the facilities for which Google publishes site-level Power Usage Effectiveness data. PUE compares the total electricity entering a data center with the electricity used directly by computing equipment.
Google’s data center efficiency reporting has regularly listed the Douglas County campus with PUE values near the company’s highly efficient fleet average. PUE changes by quarter and should be read as an operational efficiency metric rather than a measure of total electricity consumption.
A very efficient hyperscale campus can still consume a large amount of total electricity if it contains enough servers. Our guide to how much power data centers use explains the difference between efficiency and total load.
Does Douglas County Need Substations and Transmission?
Like other hyperscale facilities, the Google Douglas County data center depends on substantial electrical infrastructure. Google does not publish every project-specific substation or transmission detail on its public location page.
Large operating campuses generally rely on utility substations, redundant feeds and other infrastructure designed to provide reliable service. As server density grows, expansions can trigger new transformers, feeders or transmission work even at sites that have operated for years.
See our data center substation guide for an explanation of how electricity moves from the grid into a hyperscale campus.
Jobs and Google’s Georgia Presence
Google does not provide a single current permanent-job figure for the Google facility on its public Georgia location page. The company does say it hires locally and supports workforce-development efforts across Georgia.
Google and the electrical training ALLIANCE are also investing in skills development for electricians in Georgia, reflecting a broader constraint across the data center industry: large campuses require significant electrical construction labor in addition to the smaller workforce that operates the completed facility.
Our guide to data center jobs explains why construction and permanent employment should always be reported separately.
How Douglas County Fits Into Google’s 2026 Georgia Expansion
The operating Georgia campus remains operating while Google expands elsewhere in Georgia. In 2026, Google added Columbia County and LaGrange to its list of Georgia locations in development.
That creates a three-part Georgia footprint:
- Douglas County: established operating campus
- LaGrange: new location in development
- Columbia County: new location in development
This geographic expansion is one reason Georgia has become a major state to watch for hyperscale infrastructure. The state’s existing fiber, utility system and technology workforce now support both mature data center markets and large new developments.
What Is Still Not Public?
Despite the long operating history of the Douglas County campus, several campus-level facts are not prominently disclosed on Google’s public location page, including:
- Total current MW capacity
- Total campus square footage
- Current number of buildings
- Current permanent employee count
- Annual campus-level water consumption
For an operating facility, those details may be spread across utility filings, environmental records and local property documents rather than a single company fact sheet.
Frequently Asked Questions About the Google Douglas County Data Center
When did the Google Douglas County data center open?
Google says it opened its Douglas County data center in 2007 after beginning its presence in the county in 2003.
Did Google expand the Douglas County data center?
Yes. Google announced a $300 million expansion in 2015.
Does the Google Douglas County data center use recycled water?
Yes. Google says it began using recycled industrial water for cooling at its Georgia data centers in 2012.
Is the Douglas County data center still operating?
Yes. Google currently lists Douglas County, Georgia as an operating data center location.
How efficient is the Douglas County data center?
Google publishes PUE data for the campus, and recent reported values have remained near Google’s highly efficient fleet averages. PUE measures facility overhead, not total electricity consumption.
Where are Google’s other Georgia data centers?
Google also lists new locations in development in LaGrange and Columbia County.
Where can I track Georgia data center development?
Use the Georgia Data Center Projects Tracker.